September 8, 2016

Coffer Installation

29623381126 c87f64156b o
Each triangle is made from Douglas Fir.
29577355031 0785ac029d o
An illustration of the ceiling coffers.
29577123691 195a0e5e03 o
A 60 foot coffer section is lifted by crane over the new extension.
29547445162 e4d4298f68 o
One of 30 coffer sections being lowered into place.
29032155894 282ce61ffd o
View from Elgin St.
29547444582 a0ee06e94e o
Wooden coffers being installed in the tower.
29032155524 0f15d9db6a o
Wooden coffers being installed in the tower.
29547444462 edef8e607e o
Wooden coffers being installed in the tower.
29032155244 f70e399a9f o
Wooden coffers being installed in the tower.
29032155364 a9aa81340e o
The coffers are pre-wired with building services.

PCL Constructors dropped the wooden roof/ceiling coffers into place on the new tower entrance at Elgin Street and along the new extension closer to the Rideau Canal.